Boat built by Dean Herring
Dean
Herring of Carolina Daysailor's Club is building a Jim
Michalak designed Mikesboat. His buidling log follows.

Mike's
Boat Build Log
Feb 20 2011 - Launch
Feb 12
2011 - B'Scout hull finished and ready for trailer
Feb 06
2011 - Finishing mast with bronze coin "bearings", HIN number stamped,
compass mount, hatch cover
Jan 31
2011 - Boom glue up, nicely cut scarf
Jan 29
2011 - Upper and lower mast sections. Aluminum tube will be used
to reinforce the connecting plate.
Jan 21
2011 - Dean is making a two piece mast which will be 21' in length.
Here he is planing the lower section of the upper mast to fit
into a piece of aluminum pipe which will also be fitted over the top of
the lower mast.
Jan 17
2011 - Complete rudder set up.
Jan 15
2011 - Photo 1 : completed rudder blade mounted in rudder cheek. Photo
2 : completed tiller, Photo 3 : full rudder/tiller assembly.
Photo 4 : tiller being sanded. photo 5 : Completed leeboard
completed and mounted in place, nice red painted rub rail.
Jan 11
2011 - All the rudder parts are being clamped for gluing.
Jan 10
2011 - Here the rudder has been coated with a mixture of epoxy and
graphite powder.
Jan
08
2011 - Home made scarfing jig being put to use on the saw table to make
the pile of tiller parts laid out in second shot.
Jan 06
2011 - Here the rudder has been glassed (fiberglass cloth and
epoxy on both sides) this will keep the lead in place and encapsulate
the wooden rudder. The second picture shows the painted seats.
Jan 02
2011 - One coat of paint in cockpit and leeboard coated with
graphite/epoxy coating.
Dec 31 2010 -Prepping and sanding leeboard and rudder for
graphite/epoxy coating.
Dec 30 2010 - Deck being used as boatbuilder/painters work bench.
Susan again called to duty to finish glassing leeboard.
Dec
29 2010 - Dean lucked into some free lead for the rudder, a 100 year
old pipe fitting. You'll see two rudder blades below, the shorter
on is the one per plans which will now be used for my Toon2. Dean
based on reccomendations from other Mikesboat builders has made his
longer. Dean called me over the holiday with some inspiration
based on some chineese take out in an aluminum tray, which was used to
make the molds for the lead inserts for the rudders.. Leeboard
edges glassed and coated. Bottom picture more lamps used to help
cockpit paint dry.
Dec
28 2010 - One rudder cheek side is glued to center insert.
Dec
26\7 2010 - Dean is making a modification from the Mikesboat plan.
He is
making the rudder check to over both sides of the rudder blade, insteap
of just bolting to a single sided cheek.
Dec
26 2010 - Here the edge of the leeboard is recieving a layer of glass
tape.
Dec 26 2010 - Dean is making a modification from the Mikesboat plan.
He is making the rudder check to over both sides of the rudder
blade, insteap of just bolting to a single sided cheek.
Dec 23 2010 - Decks coated with epoxy. Hatch combings being glued
in place.
Dec 22 2010 - Front hatch cut and fit to
size, precoating paint in the cockpit
Dec 21 2010 - Dean shown here cutting our rudder cheek parts.
Dec 20 2010 - Decks coated with epoxy. Hatch combings being glued
in place.
Dec 18 2010 - Dean shown here cutting our rudder cheek parts.
Dec 17 2010 - fore and aft chanbers are patinted lamps being
used to raise tempature to assist paint drying.
Dec 12 2010 - Decks and hatch openings cut. Leeboard in upper
guard.
Dec 4 2010 - Weather in North Carolina has been very cold for this time
of
year. Dean lounging on his seats fitted into Mikesboat. Bow deck
with hatch cutout.
Dec 3 2010 - Decks fitted for size.
Nov 28 2010 - Dean fiberglassing the bottom, so he can take his 65
pound lap dogs aboard.
Nov 19 2010 -great view of the mast step and partner on forward
bulkhead.
Nov 17 2010 - Heavy mast parterner bolted in place.
Nov 13 2010 - Mast step securely set in
place with epoxy filtes. Seat framing intalled Dean daydreaming
of adventures at the helm.
Nov 7 2010 - Flip crew sets the
Mikesboat right side up. Also see the fruits of the Susan's
labor, nice paint job.
Nov 5 2010 - Dean's better half Susan
putting on a coat of boyscout green to the Mikes boat. The power
plane makes short work of fairing the rudder.
Nov 1 2010 - The Three sided sprit
sail has arrived.
Oct 31 2010 - Happy
Halloween - and Dean's treat is a glued up upper mast.
Oct 30 2010 - Leeboard guard and pivot
bolt support epoxied in place.
Oct 28 2010 - the lee board is mounted on it's pivot point, and the
guard (slot not yet cut is fitted.
Oct 22 2010 - Here Dean is marking out
where the lee board gurad will be attached.
Oct 9 2010 - Dean is making a two part mast here he is routing
out some of the center of the lower mast to reduce weight.
Oct 8 2010 - Epoxy and graphite coats
the bottom
Oct 5 2010 - Skeg cut, trimmed and fitted
Oct 4 2010 - Keel glued in place
Oct 3 2010 - The keel is glued into place with lots of
weights to clamp, the temp frame is removed once the tape/epoxy on the
outside joints are set.
Oct 2 2010 - Later that day - as I had suggested ;) Dean
applied tape to still wet outside joints for best adhesion. Also
purchased lumber for mast
Oct 2 2010 -
I had the pleasure to spend the morning working with Dean to filet the
outside seams and help plan next steps with keel, skeg and mast.
Sept 29 2010 -
Taping the inside seams in cockpit, test fitting motor

Sept 22 2010 - Adding bow deck support
Sept
18 2010 - Taping the inside seams, prep by cutting fiberglass tape,
filet the seams lay in tape, epoxy in tape.
Sept 17 2010 - Stitching in the blige panels, duct tape the seams, flip
the hull to filet and tape the inside seams.


Sept
12 2010 - Stitching in and glueing the botttom, fitting and add butt
straps to the bilge panels


Sept 10 2010 - assembling the bottom and complete the installlation of
the wales.
Sept 10 2010 -Flip the hull and dryfit fhe bottom
Sept 10 2010 - assembling the bottom and complete the installlation of
the wales.


Sept 04 2010 - Glue and screw bulkheads and attaching the wales

Sept 03 2010 - Mike's
boat going three dimensional - sides to bulkheads, temp frames, bow and
stern transoms


Aug 29 2010 - Port and
Starboard side panels
Aug 28 2010 - Saw horses and side panels with butt joints
Aug 22 2010 - Bulkheads rudder, leeboard & bottom, batten to
make
side panels
Aug 15 2010 - Bulkheads with framing
sticks, rear transom, temp form
Aug 15 2010 - Bulkheads with framing
sticks, rear transom, temp form


Aug
7
2010 - Bulkheads
Aug 1 2010 - Bow Transom and Workshop

July
30 2010 - Here is the pile of materials to begin the build of
Mikes boat.